Drawing sets are too large to fully coordinate manually.
A typical commercial project runs 300–600 pages across architecture, structure, MEP, and civil. Even a residential project can run 150+. The conflicts that slip through become RFIs, change orders, and permit delays.
AI that reads every page, every discipline, every time.
Dimensional Conflicts
Mismatches between plan dimensions and structural grids.
Material Discrepancies
Contradictions between schedules and specifications.
Code & ADA Flags
Issues caught before the permit examiner finds them.
Inter-Discipline Gaps
Scope that no discipline claims — found before the contractor does.
Addenda Conflicts
Revisions that create new contradictions in the base set.
Prioritized Reports
Actionable findings organized by type and sheet reference.
Every project type can break differently.
Custom & Residential
- Conflicts surface before the homeowner or permit office finds them.
- Code flags caught pre-submission — no correction rounds pushing back move-in dates.
- Documented review creates a due diligence record for dispute protection.
Commercial & Institutional
- Inter-discipline scope gaps — the leading source of commercial RFIs — caught before submission.
- Cleaner submissions protect hard delivery dates from permit correction cascades.
- Addenda conflicts flagged before they create bid errors or contractor claims.
QSR & Retail Rollouts
- Prototype errors caught before they propagate across every location.
- Brand-standard specs verified for consistency across sites.
- Faster permit turnaround per location compresses the rollout timeline.
The most common liability claims are also the most preventable.
| Error | Consequence | Exposure |
|---|---|---|
| Dimension / grid mismatch | Field rework, change orders | RFILiability |
| Material conflict | Submittal rejection | RFI |
| Code / ADA omission | Permit rejection | PermitLiability |
| Addenda conflict | Scope disputes, bid errors | RFILiability |
| Missing scope | Field cost dispute | Liability |
Your entire document set, read as one connected body of information.
Parse & Extract
Drawings, specs, schedules, and addenda ingested as structured data.
Cross-Document Clash Detection
Every data point checked against every other — across all disciplines.
Code & Compliance
Conditions evaluated against applicable codes before submission.
Scope Gap Identification
Work implied by one discipline but claimed by none — flagged automatically.